Pragya Singh Tomar, B. D. S. (2020). GA-BASED IMPROVEMENT HEURISTIC FOR MINIMIZING MAKESPAN IN A GENERAL FLOW-SHOP SCHEDULING PROBLEM. Design Engineering, 1109 - 1115. https://doi.org/10.17762/de.vi.3297