[1]
Deepak Gupta, Richa Goel, Harshleen Kaur 2021. Minimizing Hiring Cost of the Machines Under No Idle Constraint in N*2 Flow Shop Scheduling with Transportation and Set up Time with Fuzzy Approach. Design Engineering. (Dec. 2021), 2365 - 2371.