[1]
Pragya Singh Tomar, B.D.S. 2020. GA-BASED IMPROVEMENT HEURISTIC FOR MINIMIZING MAKESPAN IN A GENERAL FLOW-SHOP SCHEDULING PROBLEM. Design Engineering. (Aug. 2020), 1109 - 1115. DOI:https://doi.org/10.17762/de.vi.3297.